BY CHARLES J. MILLER
March 14, 1980
I would like to use a small job which I have just completed as a basis for determining special overburden handling considerations and to relate direct out-of-pocket costs to the mining operation. It is given here that detailed site analysis, including a detailed chemical characterization of the overburden,
has been performed and it is determined that:
Based upon on this overburden information it is determined that:
The following slides show these overburden handling techniques:
Slide #1
A typical section of overburden from the Kittanning coal. The upper brownish material is about 35 feet of sandstone. The high croma brown color is a good indicator that weathering and oxidation processes have removed most of the acid producing potential of this material. The quality of this sandstone ranges from excess neutralization potentials of 23 Tons/ 1000 Tons to deficiencies of 22 Tons/1000 Tons with a paste pH range of 5.5 to 8.2. There are No negative NP's.
There is about a 10-foot layer of mudstone immediately below the sandstone which again has zones of excess carbonates and zones deficient in carbonates. The mudstone and binder immediately above the coal and the pavement floor is toxic.
Slide #2
This slide shows the toxic material from immediately above and below the coal seam being selectively placed in the backfill by a loader.
Slide #3
This slide shows toxic material being selectively placed in a partially backfilled strip pit. The pit is filled with about 25' to 30' of overburden and the toxic material is placed away from the highwall and compacted.
Slide -#4
This slide shows toxic material being segregated in the backfill away from the highwall and well above the pit floor. Compaction is being performed with a dozer. We are becoming increasingly aware of the need for compacting this toxic material.
Slide #5
This slide shows agricultural lime being applied to the segregated toxic material after it is placed high in the backfill, away from the highwall, and has been compacted.
Slide #6
This slide shows the toxic material segregated and treated in the backfill being covered with some of the most favorable overburden material available. The toxic material will be about 20 feet from the final graded surface of the backfill.
Slide #7
This slide shows an agricultural lime spreader and truck used by our company for revegetation and special overhandling procedures.
Slide #8
This slide shows agricultural lime being applied to the coal pit floor after all loose caol pavement material has been removed. In a pit approximately 80 x 100 the rate of application is about 4 tons on the toxic material in the backfill
Slide #9
This slide shows a pit floor which has been treated with agricultural lime.
Slide #10
This slide shows back-up lime spreading equipment for special conditions or breakdowns. The tractor is 4 wheel drive with 60 horsepower pulling a 6 ton spreader bin.
Slide #11
This slide shows the pond, backfill and vegetation of this job. No water treatment has been necessary to date.
To project the actual cost of special overburden handling techniques, I have used the method of operation just reviewed and projected this information into a hypothetical permit. The hypothetical Permit XYZ has a disturbed area of 75 acres with 50 acres of Lower Kittanning Coal four feet thick. The planned production is 10,000 tons per month for a period of 35 months. Stripping equipment includes trucks, loaders and dozers. The drainage system consists of diversion ditches carrying water to two ponds. Both ponds receive drainage from areas mined after May 3, 1978, and are consequently under the jurisdiction of the Federal office of Surface I-lining as well as the West Virginia Department of Natural Resources. The combined flow from both ponds is 100 gallons per minute with a pH of 3.5 and total acidity of 500.
In addition to projecting the cost of special overburden handling techniques, I will project the cost of water treatment on this job without special overburden handling and make a comparison of the two alternatives.
I. Cost of Special Overburden Handling Techniques
Pit Size: 80 X 100 = 8000 ft2 w/ 4 ft coal = 1285 Tons Coal
| Loader (12yd) | @ $96* | per | hour X 60% | (fair to good) = |
$57 |
| Truck (50 ton) | @ $58 | per | hour X 85% | = | $50 |
| Loader (3yd) | @ $48 | per | hour X 60% | = | $29 |
| Dozer (D-9) | @ $91 | per | hour X 80% | = | $73 |
| Lime Spreader | @ $16 | per | hour X 90% | = | $14 |
| Lime | @ $ 4 | per | ton | = | $ 4 |
*30th Edition Nationally Averaged 1978 Rental Rates for Construction Equipment
Clean rash from top and bottom of coal
| 100' X 80' X .5 ft. | = | 4000 ft2 | = | 148 yards |
| 100' X 80' X .25 ft. | = | 2000 ft2 | = | 74 yards |
| 222 yards of toxic material |
| Coal Cleaning | = | 2 hours w/ 12 yd Loader | $ 114 | |
| = | 2 hours w/ 3 yd Loader | $ 58 | ||
| = | Subtotal | $172 | ||
| Pit Cleaning | = | 2 hours w/ 12 yd Loader | $ 114 | |
| = | Subtotal | $ 114 | ||
| Trucking | = | 1 hour tow 50 Ton trucks | $100 | |
| = | Subtotal | $100 | ||
| Compacting & Grading | = | 1 hour w/ D9 Dozer | $73 | |
| = | Subtotal | $73 | ||
| Liming | = | Pit floor | a. Lime 4 tons | $16 |
| = | b. Spreader 1-1/2 hours | $24 | ||
| = | Subtotal | $40 | ||
| Toxic Material in backfill | ||||
| a. Lime 4 tons | $16 | |||
| b. Spreader 1-1/2 hours | $24 | |||
| Subtotal | $40 | |||
| GRAND TOTAL (out-of-pocket) hour w/ D9 Dozer | $ 549 | |||
| Coal in pit (4' coal X 1750 T/Ac ft X 8000ft2) | = 1285 Tons |
| Cost per ton | = $0.43 Per Ton |
| Cost per month @ 10,000 Ton Level | = $4,300 |
III. Potential Water Treatment Costs: Permit XYZ
| Site No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| A. pH | 3. 0 | 2. 5 | 3.0 | 3.1 | 3. 1: | 2.6 | 4.6 | 4. 3 |
| B. Acidity | 320 | 3100 | 760 | 190 | 320 | 1070 | 21 | 19 |
| C. Alkalinity | <1 | <1 | <1 | <1 | <1 | <1 | 7 | 5 |
| D. Iron | 52 | 638 | 110 | 13 | 14 | 92 | 0.05 | .83 |
| D. Manganese | 12 | 100 | 41. | 6.2 | 23 | 6.0 | 4.6 | 2.0 |

4. Water treatment Costs
| Materials (Soda Ash Briquettes) | $2661.00 per month |
| Labor (1 Man) | 1380.00 per month |
| $4041.00 per month |
IV. Current Requirements of Permit #XYZ
1. Assumptions
| Total Acreage | 75 acres |
| Coal Acreage | 50 acres |
| Production Rate | 10,000 Tons per month |
| Shipping Ratio | 12:1 |
| Total Coal Reserve | 350,00d Tons |
| Length of Operation | 35 Months |
| Permit Started | January, 1977 |
| Planned Completion | December, 1980 |
2. Water Treatment Costs
| Per Month (Materials & Labor) | $ | 4,041.00 |
| Per Year | $ | 48,492.00 |
| Per Job (35 Months) | $ | 141,435.00 |
3. Special Handling Costs
| Per Ton | $ |
0.43 |
| Per Month | $ |
4,300.00 |
| Per Year | $ |
51,600.00 |
| Per Job | $ | 150,500.00 |
4. Special Handling vs. Water Treatment
| Special Handling Costs | $ | 150,500.00 |
| Water Treatment Costs | $ | 141,435.00 |
| Difference | $ | 9,065.00 |
5. Federal and State Legal Requirements
A. Performance Standard for effluent limits
pH 6.0 to 9.0
iron 3.5 to 7.0 ppm
mn 2.0 to 4.0 ppm
alkalinity greater than acidity
suspended solids 35 to 70 ppm
B. Who regulates these discharges?
- WVDNR, Reclamation Division
- WVDNR, Water Resources Division
- U.S. Office of Surface Mining
- U.S. Environmental Protection Agency
- Environmental Groups
C. What are the requirements for water quality?
- OSM requires water from the pond discharge to meet the effluent limits for areas mined after May 3, 1978 regardless of any mitigating circumstances. The effluent limits must be met until final bond release.
- EPA responds only to citizen complaints and requires that the effluent limits be met until release of the grading bond. Monitoring and lab reports required.
- DNR requires that no grading bond will be released which has an acid discharge (pH less than 6.0) regardless of ~~= circumstances. In addition, water quality must meet the effluent limits without treatment to qualify for grading and final bond release. Monitoring and lab reports are required.
D. What is an operator's limit of liability?
Legal requirements as currently interpreted by State and Federal Regulator Agencies dictate that the bond release process cannot begin until water quality meets the effluent limits without treatment regardless of the pre-existing water quality or circumstances. This con stitutes unlimited liability for water quality. Permit Status December, 1980
E. Permit Status December, 1980
- With special handling of overburden for water quality the discharges should meet the effluent limits and be eligible for grade release in the spring. If the West Virginia Permanent Regulatory Program Proposal submitted to OSM is approved, the permit will be eligible for final vegetative release within a time frame of 2 to 5 years. Water Quality must meet the effluent limitations to qualify for final bond release.
- With water treatment under current DNR interpretations the permit does not qualify for grading release until the water meets the effluent limitations without treatment.
- Economic Implications
| Cost of Special Handling | $ 150,500 |
| Cost of Water Treatment | $ 141,435 |
| Savings during mining thru Dec. 1980 | $ (9,065) |
Water Treatment Cost - 1981 |
$ 48,492 |
Savings thru December, 1980 |
9,065 |
Difference |
$(39,427) |
Water Treatment Cost - 1982 |
$ 48,492 |
Cumulative to date |
$ 87,919 |
Water Treatment Cost - 1983 |
$ 48,492 |
Cumulative to date |
$136,411 |
Water Treatment Cost - 1984 |
$ 48,492 |
Cumulative to date |
$184,903 |
FOOD FOR THOUGHT?